Loop 375 Roadway Widening & Interchange

RTG led the schematic design, alternatives analysis, and environmental studies for 5.2 miles (Spur 601 to US 62/180) of roadway widening to add a third travel lane in each direction as well as frontage roads, ramps, and direct connectors at the Spur 601 Intersection. Tasks included project coordination, developing alignment/intersection alternatives and alternatives screening matrix, geometric design, preliminary cost estimates, preliminary engineering report and preparation of conceptual schematics.

Project Information

Owner
TxDOT El Paso District
Location
El Paso, TX
Project Limits
Spur 601 to US 62/180
Role
Prime
January 29, 2020