Gattis School Road (Segment 3) Reconstruction

RTG led the schematic design and PS&E development to reconstruct Gattis School Road (Segment 3) from 0.25 miles west of A.W. Grimes Blvd. to 0.20 miles east of Double Creek Drive. The project is located along a developed corridor that includes adjacent chuches, commercial development, recreational centers, high schools, and a fire station. The project scope includes both the widening of the existing section to full reconstruction and converting the existing roadway from a four-lane to a six-lane divided facility. A 10-ft wide shared use path will be included throughout the project limits. Three cross drainage structures were improved, including a FEMA Zone AE bridge-class culvert crossing.

RTG developed the preliminary schematic design and provided support to the City during public involvement efforts. The public involvement efforts included a public meeting and meetings with affected property owners. RTG developed a detailed 3D rendering of the project to illustrate the proposed improvements to the general public to help gain public support at the public meeting.

Project Information

Owner
City of Round Rock
Location
Round Rock, TX
Project Limits
0.25 miles west of A.W. Grimes Blvd to 0.20 miles east of Double Creek Drive
Role
Prime
January 29, 2020