RTG prepared alternative and design schematics for 10 miles of urban controlled-access freeway widening and reconstruction. The project included both reversible and concurrent-flow HOV lane sections and the reconstruction of existing rural frontage roads to a three-lane urban section. RTG’s scope of work also included a traffic operational analysis of the corridor including the IH 45 / Beltway 8 directional interchange.
Project Information
Owner
TxDOT Houston District
Location
Harris County, TX
Project Limits
Beltway 8 to FM 518
Role
Prime