US 83 Facility Upgrade

PS&E for the conversion of 6.4 miles of an existing two and four-lane roadway to a four-lane divided trunk system facility. Project required earthwork, development of all construction phases, extensive drainage analysis and storm drain design, driveway and utility coordination and geotechnical investigations. RTG performed all design tasks and PS&E assembly.

Project Information

Owner
TxDOT San Angelo District
Location
Junction (Kimble County), TX
Project Limits
South of IH 10 to 6.4 miles north of IH 10
Role
Prime
November 16, 2019