RTG was responsible for the alternative analysis, traffic studies, and preparation of design schematics and ROW determination for 10 miles of urban controlled-access freeway widening and reconstruction from south of IH 10 to US 69/287-US 96 split. CORSIM was utilized to model interim year traffic to prepare an phased implementation plan outlining the ultimate improvement and needed opening year for the various identified construction phases.
Project Information
Owner
TxDOT Beaumont District
Location
Beaumont, TX
Project Limits
South of IH 10 to US 69/287-US 96 split
Role
Prime