Loop 1604 Capacity Improvements

Conceptual schematic layout of three alternatives (added general purpose (GP) lanes, managed lanes outside of GP lanes, managed lanes inside of GP lanes) for adding capacity to 35 miles of urban controlled-access freeway. Project included the Loop 1604 interchanges with IH 35, US 281, IH 10 West, and SH 151. RTG performed all schematic design tasks for the three alternatives.

Project Information

Owner
Alamo Regional Mobility Authority
Location
Bexar County, TX
Project Limits
IH 35N to US 90W
Role
Subconsultant
November 5, 2019