RTG completed the PS&E to upgrade 1.2 miles of a two-lane rural roadway to a five-lane urban section. The project included the development of numerous traffic control plans for the proposed bridge construction. RTG performed all design tasks and PS&E assembly other than structural design.
Project Details
Customer
City of Round Rock
Location
Williamson County, TX
Project Limits
Sam Bass Road to FM 3406
Role
Prime